Forepeak tank welding. CHIRP report M2745 describes two contractors welding in a forepeak tank while the vessel was loaded with diesel. They were repairing a crack that allowed seawater ingress, under the supervision of an onboard superintendent.
There was no permit-to-work or enclosed-space entry procedure. No rescue equipment or crew were present, and the reporter saw no evidence of gas monitoring.
The report says the job was handled as a routine repair. The same pattern can appear on any vessel when work is classified by its familiar name rather than by its actual exposure: a repair involving welding and tank entry is still high-risk work.
CHIRP's stop condition is direct: if the permit is not in place, the risks may not yet be understood well enough for work to begin.
Before the next tank repair starts, who verifies that the permit is in place?
#MaritimeSafety #SafetyManagement #OccupationalSafety #SafetyCulture #Maintenance
